The floor had obviously dried enough for them to work.
Progress today:
Old ceiling removed - prepared for the downlights
Cable pull tubes installed
Door between the bathroom and bedroom removed (this will become a wall containing the pipe-in-pipe inspection box)
Some pipe-in-pipe outer tubes and manifolds installed
End wall inner panel (chipboard or similar) mounted (around window)
Click to view full size: End wall showing window and some pipe-in-pipe manifolds
End wall showing window and some pipe-in-pipe manifolds
Click to view full size: Ceiling prepared for downlights
Ceiling prepared for downlights
Click to view full size: Pipe-in-pipe inspection box in the old doorway (will be a wall)
Pipe-in-pipe inspection box in the old doorway (will be a wall)
Click to view full size: Electic pull tubes in place
Electic pull tubes in place
Click to view full size: Close-up of the pipe-in-pipe manifolds for the bath
Close-up of the pipe-in-pipe manifolds for the bath
Click to view full size: Close-up of the end wall showing both bath and basin connections
Close-up of the end wall showing both bath and basin connections